FESCO New Connection & Meter Installation Process Explained [2025 Guide]
Getting a new electricity connection can feel overwhelming, especially when you’re not sure where to begin. If you live in Faisalabad or nearby regions covered by FESCO (Faisalabad Electric Supply Company), this complete guide will walk you through the entire process of applying for a new electricity connection and installing your meter. Whether you’re a homeowner, business owner, or farmer, this article breaks down the steps in a simple, conversational way—perfect for 2025.
What Is FESCO?
FESCO, short for Faisalabad Electric Supply Company, is one of Pakistan’s major electricity distribution companies. It provides power to over 26 million people across eight districts including Faisalabad, Sargodha, Mianwali, and Jhang. Known for its relatively efficient service, FESCO is also pioneering in digital transformation to simplify customer FESCO New Connection FESCO New Connection
Who Can Apply for a New FESCO Connection?
Anyone who needs a new electricity connection—whether for residential, commercial, industrial, or agricultural use—can apply through FESCO. The applicant must:
- Be the owner or legal occupant of the property
- Have proper documentation like CNIC, property papers, etc.
- Clear any previous dues associated with the property (if applicable)
![FESCO New Connection & Meter Installation Process Explained [2025 Guide] 2 OIP 1](https://fescoonline.com/wp-content/uploads/2025/07/OIP-1.webp)
Step-by-Step Guide to Applying for a New FESCO Connection
Step 1: Online or Offline Application
You can apply for a new connection in two ways:
Option 1: Online (Recommended)
Visit the FESCO online application portal and fill out the required form. The portal is user-friendly and supports both Urdu and English.FESCO New Connection
Option 2: Offline
Visit the nearest FESCO customer service center and collect a physical application form. Fill it out and submit it along with required documents.FESCO New Connection
Step 2: Attach Required Documents
Make sure to attach the following documents with your application:
- Copy of CNIC (of applicant and witnesses)
- Proof of ownership (Registry, Allotment Letter, etc.)
- No Objection Certificate (NOC), if required
- Affidavit confirming no prior connection at the premises
- Neighbor’s electricity bill (sometimes required for address verification)
Step 3: Site Verification
Once the application is submitted, a FESCO officer will visit the premises to inspect:
- Load requirement
- Site feasibility
- Safety conditions
This is to ensure the site complies with WAPDA safety and technical standards.
Step 4: Demand Notice Issuance
If your site is approved, FESCO will issue a Demand Notice. This document outlines the estimated connection cost, which includes:FESCO New Connection
- Service line charges
- Security deposit
- Meter cost
How to Pay the Demand Notice:
You can pay at designated bank branches or online via:
- JazzCash
- Easypaisa
- Online banking
Step 5: Submit Paid Copy of Demand Notice
Once paid, submit the stamped copy of the Demand Notice to your FESCO Sub-Division Office or upload it on the online portal if you applied digitally.FESCO New Connection
Step 6: Meter Installation & Final Connection
After payment confirmation, FESCO schedules meter installation within 15 to 30 working days. The technical staff will:
- Install the meter box and service line
- Activate the power supply
- Issue a first meter reading slip
Your electricity connection is now live!
Common Types of FESCO Connections
1. Residential Connection
Used for homes and apartments. Load requirement: 1–10 kW.
2. Commercial Connection
For shops, offices, and small businesses. Load requirement: 1–50 kW.
3. Industrial Connection
High-load connections for factories and industries. Load requirement: 50+ kW.
4. Agricultural Connection
For tube wells and irrigation pumps. Usually subsidized by the government.
FESCO Connection Fees (Estimated for 2025)
| Connection Type | Estimated Cost (PKR) |
|---|---|
| Residential | 8,000 – 15,000 |
| Commercial | 20,000 – 40,000 |
| Industrial | 50,000 – 200,000 |
| Agricultural | 10,000 – 25,000 |
Note: Charges may vary based on load, distance from the pole, and other factors.
How Long Does the Process Take?
| Stage | Estimated Time |
| Application Review | 3–5 working days |
| Site Inspection | 7–10 working days |
| Demand Notice Issuance | 5–7 working days |
| Meter Installation | 15–30 working days |
Total Time: 30 to 45 working days (average)
FESCO New Meter Installation Tips
- Apply early if you’re building a house or office
- Keep all documents ready to avoid delays
- Pay the demand notice quickly to get into the installation queue
- Stay in touch with your local FESCO office for updates
Real-Life Example
Ahmed from Sargodha applied for a residential connection in March 2025. He used the online portal and uploaded all documents. FESCO issued a demand notice within 10 days. After payment, his meter was installed in 21 working days. His total cost was PKR 12,500. “The online system saved me multiple trips,” he said. FESCO New Connection
FAQs About FESCO New Connections
Q1: Can I track my application status online?
Yes, visit the ENC tracking portal and enter your tracking ID.
Q2: What if my application is rejected?
You’ll receive a written explanation. You can reapply after addressing the mentioned issues.
Q3: Can tenants apply for new connections?
Only if they have written permission or an affidavit from the property owner.
Q4: Is there a fast-track option?
Currently, FESCO does not offer an official fast-track. However, online applications are processed faster.
Final Thoughts
Getting a new FESCO electricity connection in 2025 is easier than ever—especially if you choose the online application route. With clear steps, proper documentation, and timely payment of your demand notice, your connection can be up and running within weeks. By staying informed and prepared, you can avoid delays and enjoy uninterrupted power. FESCO New Connection