FESCO Net Metering Solar: A 2025 Guide to Earning from the Sun
Are you tired of high electricity bills and constant power outages in Pakistan? Imagine turning your rooftop into a money-making powerhouse that not only powers your home but also earns you passive income. Sounds too good to be true? It’s not—FESCO Net Metering Solar is the real deal.
This blog post walks you through everything you need to know about FESCO’s net metering solar system in 2025—how it works, who can benefit, how to apply, and how much you can actually save or earn. So, let’s shed some light on this sunny opportunity.
What Is and Why Does It Matter?
Net metering is a billing mechanism that allows you to sell excess solar electricity back to the grid. If you have solar panels on your roof and produce more electricity than you use, the extra units are sent back to FESCO’s grid—and you get credited for it.
So instead of wasting that power, you’re helping the national grid—and getting paid.
Real-life Example
Meet Mr. Ahmed from Faisalabad. In 2023, he installed a 10 kW solar system on his home. Before net metering, his electricity bill was over Rs. 25,000 per month. After net metering, his bills dropped to under Rs. 3,000, and in some months, he actually earned credits.
By mid-2024, he’d recouped nearly 40% of his solar system investment through saved bills and payments.

How FESCO Net Metering Solar Works
Let’s break it down in simple steps:
Step-by-Step Process
1. Install a Solar System
First, you need to install a grid-tied solar system (on-grid solar) with at least a 3 kW capacity. Make sure your installer is AEDB (Alternative Energy Development Board) certified.
2. Apply for Net Metering through FESCO
After your system is installed, you apply to FESCO (Faisalabad Electric Supply Company) for a Net Metering License via NEPRA (National Electric Power Regulatory Authority). 3. system Inspection
FESCO officials will inspect your system to ensure it’s up to the technical standards.
4. Bi-Directional Meter Installation
Once approved, FESCO installs a bi-directional energy meter. This special meter records both the electricity you consume and the units you export.
5. Start Earning from the Sun
From that point on, any extra solar units you generate are credited in your FESCO bill or carried forward for up to 6 months.
Benefits of FESCO Solar
Here’s why thousands of Pakistanis are turning to FESCO in 2025:
Major Advantages
1. Slash Your Bills
Net metering allows you to cut your power bills by 70–90%. In some cases, people receive negative bills (yes, FESCO owes you money).
2. Short ROI Time
With high electricity prices and government subsidies on solar panels, most people break even in 3–4 years.
3. Protection Against Load Shedding
While systems are usually grid-tied, you can add batteries to store backup energy for load-shedding hours.
4. Environmentally Friendly
Reduce your carbon footprint and contribute to a greener Pakistan.
5. Increase in Property Value
Homes with solar setups are more attractive to buyers and fetch higher resale value.
FESCO Requirements in 2025
Not everyone qualifies. Here’s what you need:
System Size
- Minimum: 3 kW
- Maximum: 1 MW
Certified Installer
Your system must be installed by a AEDB-certified solar company.
Ownership Proof
You must own the property or have the consent of the owner.
Bi-directional Meter Compatibility
Only certified bi-directional meters are accepted.
How Much Can You Save?
Let’s do some quick math.
| System Size | Estimated Monthly Generation | Monthly Bill Savings | ROI Time |
|---|---|---|---|
| 5 kW | 600–700 units | Rs. 15,000–20,000 | 3–4 years |
| 10 kW | 1,200–1,400 units | Rs. 30,000–40,000 | 2.5–3.5 years |
| 20 kW | 2,500–3,000 units | Rs. 60,000–75,000 | 2–3 years |
Note: Based on Rs. 30/unit average rate in 2025.
How to Apply for FESCO (2025 Guide)
Here’s the process simplified:
- Install your solar system.
- Contact your installer for documentation.
- Submit your documents to FESCO’s Department.
- Wait for FESCO’s on-site inspection.
- Once approved, FESCO installs a bi-directional meter.
- You start generating and exporting energy.
Required Documents
- CNIC copy
- Latest electricity bill
- System diagram and specs
- Installer’s AEDB certificate
- Application form
Top Solar Companies in Faisalabad (2025)
To make things easier, here are reliable AEDB-approved installers for FESCO :
- SkyElectric
- Reon Energy
- Premier Energy
- Zorays Solark
- Pak Solar
Always compare cost, maintenance support, and NEPRA compliance before finalizing.
Common Mistakes to Avoid
Let’s make sure you don’t waste your investment:
1. Choosing a Non-Certified Installer
This can lead to rejection by FESCO.
2. Undersizing the System
Go for a system that covers 100% of your usage, not just 50%.
3. Ignoring Maintenance
Keep your panels clean and in good condition. Dust can reduce efficiency by 20–30%.
FESCO Tariff 2025
As of 2025, the NEPRA-approved rate for excess units exported to the grid is approximately Rs. 21 per unit. This is subject to change, so always verify the latest rate before applying.
Is FESCO Worth It in 2025?
Absolutely! With rising electricity rates, a failing grid, and solar panel prices dropping due to government incentives, is one of the smartest investments you can make today.
Plus, with an increasing focus on clean and renewable energy by the Government of Pakistan and CPEC-related green projects, it’s expected that will continue to grow.
Final Thoughts
The FESCO net metering solar system is more than just a way to reduce your electric bills—it’s a step toward financial independence, energy security, and environmental responsibility. Whether you’re a homeowner, business owner, or farmer, 2025 is the perfect time to make the switch.
And remember, the sun shines on everyone—but only those with solar panels get paid for it
Featured Snippet Optimization: FAQs
What is FESCO ?
FESCO is a program that allows you to sell excess electricity generated from your solar panels back to the grid, reducing your bill or earning credit.
How do I apply for FESCO ?
You must install an AEDB-certified solar system (minimum 3 kW), then submit an application with documents to FESCO. After inspection, a bi-directional meter is installed.
How much does it cost to install a 5 kW solar system in Faisalabad?
In 2025, a 5 kW system costs between Rs. 850,000–1,100,000, depending on brand, inverter, and installer.
How long does it take to get FESCO net metering approval?
Typically, it takes 30 to 60 days, depending on documentation and inspection schedules.